No Data
No Data
Rongbai Technology: 2024 Annual Report
Rongbai Technology: 2024 Annual Report Summary
2024 ANNUAL REPORT
2024 Annual Report Summary
Ningbo Ronbay New Energy Technology (688005.SH): plans to reduce the originally planned annual production capacity of 0.06 million tons for the "2025 Power-type Lithium Battery Material Comprehensive Base (Phase I)" to 0.03 million tons and to conclude th
On April 9, Gelonghui reported that Ningbo Ronbay New Energy Technology (688005.SH) announced the construction of its "2025 Power-type Lithium Battery Materials Comprehensive Base (Phase One)" project (hereinafter referred to as "this project" or "the fundraising project"). This is a project for the annual production of 0.06 million tons of ternary precursors, with phases 1-1 at 0.03 million tons already completed, and phase 1-2 at 0.03 million tons not yet started. It is now proposed to adjust the investment scale for this project to 0.03 million tons and to conclude it. The project plans to use raised funds of 826.0029 million yuan. As of the date of this report, a total of 748.7281 million yuan has been invested, with remaining project fundraising.
Ningbo Ronbay New Energy Technology (688005.SH): Proposes to temporarily idle a portion of raised funds not exceeding 0.15 billion yuan for cash management.
On April 9, Gelonghui reported that Ningbo Ronbay New Energy Technology (688005.SH) announced that it plans to temporarily idle part of the raised funds not exceeding 150 million yuan for cash management. The usage period is valid within 12 months from the date of the Board of Directors' approval, and the maximum trading amount at any given time during the term (including the related amounts for reinvesting the aforementioned investment returns) cannot exceed the estimated amount. Funds can be used in a revolving manner within the above limits and duration.